<kbd id="12vh1"></kbd>
      <tfoot id="12vh1"></tfoot>

      Chinese firm completes beam closure along China-Laos railway

      Source: Xinhua| 2019-01-20 00:39:08|Editor: Li Xia
      Video PlayerClose

      LAOS-NAMOR-CHINA-LAOS RAILWAY-BEAM CLOSURE

      Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, on Jan. 19, 2019. China Railway No. 5 Engineering Group (CREC-5) completed the closing of the first cast-in-place continuous beam on Saturday. The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and Vientiane. (Xinhua/Huang Zongwen)

      NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

      China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

      The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

      The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

      The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

         1 2 3 4 5 Next  

      KEY WORDS: Laos
      YOU MAY LIKE
      EXPLORE XINHUANET
      010020070750000000000000011100001377581111
      免费国产精品专区,香蕉视频精品小姐福利,强行征服邻居人妻hd高清完整,伊人久久精品无码AV专区 97人人超碰国产精品最新o 亚洲AV无码成人网站国产网站

        <kbd id="12vh1"></kbd>
        <tfoot id="12vh1"></tfoot>