<kbd id="12vh1"></kbd>
      <tfoot id="12vh1"></tfoot>

      2 tunnels dug through in China-Laos Railway construction

      Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
      Video PlayerClose

      LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

      A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

         Prev 1 2  

      KEY WORDS:
      YOU MAY LIKE
      EXPLORE XINHUANET
      010020070750000000000000011100001379790851
      免费国产精品专区,香蕉视频精品小姐福利,强行征服邻居人妻hd高清完整,伊人久久精品无码AV专区 97人人超碰国产精品最新o 亚洲AV无码成人网站国产网站

        <kbd id="12vh1"></kbd>
        <tfoot id="12vh1"></tfoot>